Project Manager / Consultant

Project Manager / Consultant

Work Experience

2005 - Present

Consultant

- Review Gaz de France offshore pipeline trenching analyses and procedures.
- Prepare Noordhoek / Gaz de France diving procedures for offshore spoolpiece installation.
- Suction Pile Technology - fabricate prototype suction anchor model.

2003 - 2005

Allseas Engineering BV, Delft

Assistant Project Manager/Construction manager of the following projects:

- Pipelay vessel Solitaire conversion project, stinger and tension capacity upgrade.
- Conoco Phillips - Ekofisk pipeline installation project.
- Maersk - Halfdan / Tyra pipeline installation project.


1998 - 2003

SB Construction and Maritime Services BV (Saipem), Hoofddorp

Project Manager of the following projects:

- Blue Stream Project; Russia to Turkey 24" Submarine Gas Pipelines (2 off), shallow water scope. Installation of 4 landfalls, 2 in Russia, 2 in Turkey, 56 km of pipeline installation and 2 above water tie-ins.
- Kitina Project; Recovery of 1 km of abandoned pipeline and its contents. During preparatory work; Client representative onboard Smit Octo Marine DSV.

Deputy Project Manager, Construction Manager and Contractor Representative of the following projects:

- Ranger Oil Espoir Field Development Project; Design, procurement, fabrication, offshore installation and commissioning of a 1600T jacket, a 600T Platform Deck and a 10" gas pipeline of 19.8 km length.
- Mossgas E-M Development Project; Design, procurement, fabrication and installation of a 600t platform Module, an 18" pipeline with 3" piggy-back, an 18" riser and riser clamps.
- Mobil Zafiro SPM Pipelines Project; Design, procurement and offshore installation of a 40", 3 km long pipeline and a 7 km long 10" pipeline. Design, fabrication and installation of spools for both pipelines. Procurement and installation of 7 Production Modules onto a floating production facility, weights 60-1000T. Contractor Representative onboard DSV Discovery, during tie-in spool installation.


1989 - 1998

Allseas Engineering BV, Delft

Senior Project Engineer, Lead Engineer, Field Engineer and Contractor Representative on the following projects:

- Texaco Exploration and Production Inc, Gemini phase 1 dual 12" flow lines; Project Management.
- Texaco North Sea UK Company, Galley Field Development- Senior Project Engineer, Project Management.
- Shell UK Exploration and Production- Schooner pipelines development project- senior project engineer, manage the project in assistance of the project manager. Contractor Representative onboard DSV Subsea Mayo.
- Maersk Olie og Gas A/S Roar, Svend and Harald projects-Lead Project Engineer, co-ordinate-engineering activities required for the scope of work. Partly involved in subcontracted work such as pipeline head fabrication riser and riser clamp fabrication/installation and subsea pipeline tie-in.
- Maersk Olie og Gas A/S- Tyra Development project; co-ordinate and check engineering activities as Lead Project Engineer.
- Phillips Petroleum UK LTD- Judy/Joanne Development Project, as lead Project Engineer responsible for all engineering activities involved with the scope of work. Furthermore responsible for design and manufacturing of concrete pipeline supports at subcontractors Seamark in Broxburn, UK and responsible for rockdumping services performed by Allseas' subcontractor Tideway.
- Wintershall Noordzee-10"/12" Pipeline Bundle; Prepare diverless pipeline flooding procedure, trenching analysis and trenching procedure, perform general engineering work.
- Several Offshore projects during bid phase. Prepare information regarding expected pipeline trenching rates and project duration.
- Amoco Netherlands- P15/P18 Gas Development; Contractor representative onboard dredging vessel HAM310 during pipeline route dredging operations. Field Engineer onboard trenching support vessel "Trenchsetter" during trenching operations.
- Phillips petroleum UK Ltd, Ann development; prepare pipeline trenching analysis and procedure, perform general engineering work.
- Arco British Ltd, Orwell Development, prepare diverless pipeline flooding procedure, trenching analysis and trenching procedure, general engineering work.
- Statoil-Statfjord Satellites Norway; Manage modification activities for a diverless mattress installation frame. Prepare mattress installation procedure. Field Engineer during diverless pipeline flooding and mattress installation operations.
- Agip - Tiffany Field Development (UK) Prepare pipeline, trenching analysis and procedure.
- Amoco-Central Graben Development (UK) prepare pipeline, trenching and procedure. Field Engineer during Offshore trenching operations.
- Shell Expro - Gannet (UK) Perform pipeline out of straightness analysis using a finite element computer program. Field engineer onboard trenching support vessel the "Trenchsetter".
- Ranger Oil UK Anglia Field Development, prepare pre-sweep analysis of the pipeline route, prepare trenching analysis and procedure.
- Emso Mosselbay Gas Development, South Africa, field engineer during offshore pipeline trenching and diverless concrete mattress installation.
- Amerada Hess, Scott field development, prepare pipelay analysis and pipelay procedure.


1988 - 1989
Military Service Dutch Army
Platoon Commander, infantry APC unit.

1987
Student Contractor
- PPF International, Maarssen Industrial wastewater research, sewage treatment plant design.
- Blueprint BV, Woerden Development of food packing machines.
- Euro rigging BV, Utrecht design and draw rigging plans.


Education

VWO-B, HTS, BSc Mechanical Engineering




Languages

Dutch, English, German