Flex Manager
21219 interim professionals
21219 professionals

 Select

Find similar resumes

Construction Engineer

Construction Engineer

Work Experience

BELGIUM CONSTRUCTION PROJECT.

1991 to 1994 STRABAG nv. (BELGIUM).
PROJECT: BASF ANTWERP: POLYPROPYLENE FOR PVC PRODUCT.
POSITION: SITE CONSTRUCTION MANAGER.
1. CIVIL WORK AND STEEL CONSTRUCTION.


OVERS SEAS CONSTRUCTION PROJECT BETWEEN.(1978 TO 1991).

1978 - 1984;SAOUDI ARABIA / KHAMIS MUSHAIT.
TAG Co. RYAD.
MILITARY CONSTRUCTION PROJECT.
POSITION: SITE CONSTRUCTION MANAGER.
CIVIL WORK, BUILDING FINISHING WORK, PIPING, ELECTRICAL,LANDSCAPING.
400 HOUSES, 2 SCHOOLS, WATER TRATMENT PLANT.

1985 - 1986 SAOUDI ARABIA POWER LINE PROJECT.
A.M.AL-ISSA / ELECTRABEL BELGIUM.
POSITION: SITE MANAGER
CW & STEEL CONSTRUCTION.(+/- 150 km POWER LINE)

1987 - 1988 REPUBLIC OF ZAIRE/KINSASHA).
UNIBRA SA. (BRUWERY PROJECT +/- 6000 hl/year).
POSITION: CONSTRUCTION MANAGER.
BUILDING RENOVATION; CONCRETE WORK, STEEL CONSTRUCTION, PRODUCTION LINE EQUIPMENT, WATER TREATMENT SYSTEM OF THE BRUWERY OF THE EXISTING FACTORY.

1988 - 1991 REPUBLIC OF ZAIRE/KOLWEZI.
GECAMINE.(MINING EXTRACTION PROJECT OF COPPER).
POSITION: SITE CONSTRUCTION MANAGER;CIVIL WORK AND STEEL CONSTRUCTION.
PROCESSING PLANT OF COPPER ELECTROLYSED SYSTEM, REFRIGERATION BUILDING, CONVEYOR LINE, STORAGE BUILDING, MINERAL BREAKERS AND POWER GRINDING, POWER STATIONS, POWER LINE (STEEL TOWER) +/- 7 km).

OVERS SEAS CIVIL WORK CONSTRUCTION PROJECT.(1992 TO 1997).

1992 - 1994 ABB/HAMON LUMMUS - (HOLLAND).
ELECTRICAL POWER PLANT STEEM-TURBINE-GAZ.
POSITION:SITE CONSTRUCTION MANAGER.
- COORDINATION OF MATERIAL AND EQUIPMENT DELIVERY FROM POLAND, UK, GERMANY AND BELGIUM.
- SITE CONSTRUCTION COORDINATION (STEEL STRUCTURE, REFRIGERATION EQUIPMENT, TEST AND COMMSSIONING BEFORE THE SITE ACCEPTANCE.

1994 - 1996 BELGORX BELGIUM.
TURKEY - ISTANBUL (CARDIOLOGIE HOSPITAL PROJECT).
POSITION: SITE CONSTRUCTION MANAGER.
SANITARY AND ELECTRICAL INSTALLATION.
INTERNAL RADIO TELECOMMUNICATION.
MEDICAL EQUIPMENT.
GENSET POWER PLANT.

6 MOUNTH CONTRACT - SIH ALGER/ALGERIA. - (SOCIETE D’INVESTISSEMENT HOTELIERE).
FEASIBILITY & SYNTHESIS OF PROJECT HOTEL SHERATON ORAN /ALGERIA 78000MIL USD (74000 m2 OF PROJECT CONSTRUCTION).
COMPOSITION OF THE PROJECT: 325 ROOMS, ONE CONGRES BUILDING OF CAPACITY OF 3000 PEOPLES, 3 RESTAURANT, 1 SWIMMING POOL (INCLUDE FITNESS, DANCING), WATER TREATMENT PLANT (320 m3/hr),UNDERGROUNDPARKING (CAPACITY OF +/-1000 CARS).

6 MOUNTH CONTRACT - SOLVAY - (BULGARIA / DEVNIA).
EXTENSION OF SODIUM CARBONATE PRODUCTION PROJECT
POSITION :SITE CONSTRUCTION MANAGER.
CONCRETE AND STEEL CONSTRUCTION).


TELECOMMUNICATION MOBIL PROJECT BETWEEN 1997 - 2003

PROXIMUS BELGIUM.(SITE CONSTRUCTION COORDINATION).
BASE BELGIUM. (SITE CONSTRUCTION COORDINATION).
ORANGE TELECOM SWITZERLAND (REGIONAL MANAGER).
MOTOROLA TURKEY (REGIONAL MANAGER).
ERICSSON MAROCCO (REGIONAL MANAGER).
ALCATEL ASIA (REGIONAL MANAGER).


SOFTWARE EPERIENCE:
- WINDOW XP & MICROSOFT 2000
(Acces, Outlook, Word, Exel, Power Point).
- LOTUS NETWORK


Education

TECHNICAL ENGINEER 1970 - BELGIUM/NAMUR (IATA UNIVERSITY)



Skills

BUILDING CONSTRUCTION TECHNICAL ENGINEER

Languages

FRENCH, DUTCH, ENGLIS.
GERMAN GOOD KNOWLEG

Other

Ultaligth flying pilot (Quick Siler fligth)

 Select

Candidate search for

interimmanagementPaste your project description here